Surry Hills Apartment Renovation: How the Building Sets the Scope
Renovation Guide

Surry Hills Apartment Renovation: How the Building Sets the Scope

Richard Bechara
July 23, 2026
5 min read

The short answer

In Surry Hills the building decides the scope, not the design. Warehouse conversions, subdivided terraces and small older blocks come with limited service risers, protected brickwork, narrow laneways and small or absent lifts. So we assess the by-laws and the building first, then design to what it allows. The approval is usually the long pole, not the build.

0+

Years in apartments

0+

Projects completed

0

5-star Google reviews

0%

Strata approval rate

Renovating a kitchen or bathroom in a Surry Hills apartment is not a linear strip-out, build, finish job. The buildings are older and stranger than the rest of inner Sydney, the by-laws are tighter, and the sequence has to be worked out before anyone picks a tile. This is how we run one, from first enquiry to handover, and which parts of it are specific to Surry Hills rather than to apartments in general.

What makes Surry Hills a different job

Three kinds of building dominate the suburb, and each brings its own limits.

Surry Hills apartment stock and what it constrains
Building typeWhat it constrains
Warehouse conversionFew service risers, so plumbing usually cannot move. Exposed brick and slab ceilings often protected.
Subdivided terraceWalls and floors rarely square. Shared walls with a neighbour on the other side. No lift.
Small older walk-up blockOriginal waterproofing and plumbing near end of life. Narrow stairs, tight landings.

None of that stops a good renovation. It just means the design has to be drawn to the building rather than the building forced to accept the design, and that only works if you find out what the building allows before the design time is spent.

Renovated white galley kitchen in a Surry Hills apartment with handleless cabinetry and LED strip lighting
A galley footprint held in place and rebuilt, in a Surry Hills building with high ceilings and period door frames.
Renovated Surry Hills apartment bathroom with a floating timber vanity and frameless glass shower screen
The bathroom in the same apartment, rebuilt as a walk-in wet area.

Step 1: find out what your building allows

Before finishes or layouts, we read the by-laws. Two things come out of that. The first is the rules the building imposes on renovation approval, noise and work hours. The second is which category your job falls into, because that sets the approval pathway.

Approval pathway by work type (NSW)
Work typeWhat it coversWhat it needs
Cosmetic (s109)Painting, carpet, hanging fixturesNothing
Minor (s110)Kitchen, hard flooring, non-structural wallsOrdinary resolution
Major (s108)Waterproofing, plumbing, structureSpecial resolution and a registered by-law

Almost every bathroom is major work, because it touches waterproofing. Most kitchens are minor work unless the plumbing moves. This one step prevents the majority of the delays we see, because it tells us what is possible before a single hour of design goes into something the building will not allow. The full walk-through of the three tiers is in our strata approval guide.

What actually goes into the strata approval submission

Once we have confirmed the job is major works, we prepare the submission for your strata manager. Owners are often surprised at how much of it is paperwork about us rather than about the renovation. Four documents go in.

  1. 1.The building's renovation application form, completed and signed. Every scheme has its own version and most schemes reject an incomplete one without reading further.
  2. 2.Our current licence and insurance documentation. Fine Touch Group holds NSW Builder Licence 151772C. Committees check that the licence is current and that the public liability cover is in the name of the entity doing the work.
  3. 3.A special by-law drafted for the major works. If your building does not already have a lawyer it uses for this, Bannermans Lawyers are quick and efficient and we have worked with them before. Expect roughly $900 to $1,000 plus GST to draft, and $182.73 to register it with NSW Land Registry Services.
  4. 4.The full scope of works, which in practice is your quote with the pricing left in. Committees want to see that the work is costed properly, because an underquoted job is one that stalls half-finished in their building.

The strata manager may come back with questions, then schedules a meeting for the Owners Corporation to vote. Once it passes, we are clear to start on site. We CC owners into the entire submission thread, so you are reading the same emails we are rather than hearing about a follow-up question a fortnight after it was asked.

This is the part we carry. In 30 years and more than 1,000 Sydney apartments, our strata approval rate is 100 percent. We assemble the submission, deal with the strata manager's questions, and time the application against the building's meeting calendar so the vote is not the thing holding up your kitchen.

Getting materials into a Surry Hills building

This is the constraint that surprises people most, and it is genuinely worse here than in a modern tower. Surry Hills streets are narrow, many buildings have no loading zone and no crane access, and the lifts in older conversions are small or do not exist at all.

Three parts of the job feel it. Waste removal has to be scheduled around the building's access windows rather than done whenever the skip is full. Sheet materials and cabinetry sometimes have to be broken down and hand-carried up stairs. And stone benchtops are the sharp one, because a benchtop is templated in a single piece, fabricated off site, and then has to physically arrive at your kitchen. That route gets planned at quoting stage, not on delivery day.

Common property gets protected before any of it starts. Lift interiors, lobby floors, corridor carpet and stair nosings are covered, because damage to common property is charged back to you, and because a committee that watches its lobby get wrecked is a committee that makes the next owner's approval harder.

Surry Hills apartment kitchen with a stone peninsula benchtop and grey handleless cabinetry
The stone peninsula in our Surry Hills kitchen. Templated in one piece, fabricated off site, then routed into the building by hand.
Finished Surry Hills bathroom with olive green subway tiles, a bronze vessel basin and a black floating vanity
The same kind of room finished, in a more recent Surry Hills apartment.

What the building changes at each stage of the build

The build sequence itself is the same one we run in every apartment: demolition, rough-in, rendering, waterproofing, tiling, cabinetry and stone, then fit-off and handover. We have written that out stage by stage, with the timings, in our apartment bathroom renovation process guide. What follows is only the part Surry Hills changes.

Stage by stage, the Surry Hills variable
StageWhat is different here
DemolitionExposed brick, heritage facades and slab ceilings are protected and cannot be cut. Dust control matters more where corridors are shared and unventilated.
Rough-inNew pipework has to fit the original service risers. In warehouse conversions there is often no route for a relocated waste, so the layout adapts.
RenderingOriginal walls are uneven or damaged and need levelling before tiling. On protected brick the render has to go on without compromising the substrate.
WaterproofingSame AS 3740 standard as anywhere, but the consequence is worse: below you is someone's ceiling, and after your by-law is registered the liability is yours.
TilingFalls to the waste have to be right the first time. Cuts are set out around heritage wall sections rather than through them.
Cabinetry and stoneNothing is square, so cabinetry is scribed and levelled to the building. Stone is templated only once cabinetry is fixed, then routed in through the access constraints above.
Fit-off and handoverWe confirm with the strata manager that the finished work matches the approved by-law, and hand over the waterproofing certificate for the building's records.

That last line matters more than it sounds. Closing the loop with the strata manager gives you a clean paper trail if the work is ever queried at a future AGM, or by a buyer's solicitor when you sell.

Four things that go wrong in Surry Hills

We flag these with clients at quoting rather than when they happen. Most can be planned around if they are named early.

Access and delivery delays

Narrow laneways, no crane access and small lifts mean materials get broken down, hand-carried, or scheduled into a building access window. It is time a standard apartment job does not spend.

Failed original waterproofing found on demolition

A lot of this building stock is well past twenty years old. Degraded membranes and tired plumbing runs turn up regularly once the old fixtures come out, and that can move both scope and cost past the original quote. Carry 15 to 20 percent contingency in an older Surry Hills building.

AGM and EGM timing

Covered above, and the single most common reason a Surry Hills renovation starts months later than the owner expected.

Noise and access friction with neighbours

In close-set older buildings with shared walls, renovation noise reaches further than it would in a concrete tower. Told in advance, most neighbours are fine. Told by the sound of a jackhammer at 8am, some of them are not, and an unhappy neighbour is the person who objects at the next meeting.

The team did an amazing job with our small apartment. They figured out storage solutions we never would have thought of, and the quality of work is spot on. Everything was done on time despite the access challenges.
James and Emma, Surry Hills

The short version

Renovating a kitchen or bathroom in a Surry Hills apartment is a different job to renovating one anywhere else in Sydney, and the difference is decided before any design work starts. Heritage warehouse conversions, subdivided terraces and tight by-laws mean the building sets the boundaries of what is possible.

Our process reflects that order: the by-law and building assessment first, then the strata submission and the vote, then demolition, rough-in, rendering, waterproofing, tiling, cabinetry and stone, and finally fit-off and handover. The constraints get treated as inputs at the start rather than discovered as problems in week four. It is a more involved process than renovating a house. It is also the reason these jobs get approved without a dispute and hold up in some of the oldest apartment buildings in Sydney.

Planning a Surry Hills apartment renovation?

Start with a straightforward assessment of what your building allows. 30+ years in Sydney apartments, fixed-price quotes, strata handled end to end.

Frequently asked questions

See the project

Surry Hills small apartment renovation

A galley kitchen, a wet-room bathroom and a full-height wardrobe in a heritage building, over 12 weeks.

Go deeper

The complete Sydney strata approval guide

By-laws, the works application, and how to get approved without months of back-and-forth.

Read next

Apartment bathroom renovation process, stage by stage

The full build sequence with how long each stage takes, from strip-out to certificates.

Ready to start

Apartment bathroom renovations Sydney

Waterproofed to AS 3740, strata handled, fixed price. Real project photos only.