The short answer
A CBD apartment costs the same to renovate as one anywhere in Sydney: a kitchen from $22,000, a bathroom from $20,000, a full apartment from $60,000. What the CBD changes is the timeline. Service lift booking windows, loading dock access, restricted work hours and same-day waste removal set the pace, not the trades.
Years in apartments
Projects completed
5-star Google reviews
Strata approval rate
Most guides to renovating a Sydney CBD apartment describe a renovation that could be happening anywhere. The part that actually decides whether your job runs to schedule is the building: how materials get in, when trades are allowed to make noise, and how a large owners corporation reaches a decision. That is what this covers, with a real CBD project running through it.
What a Sydney CBD apartment renovation costs
The build cost does not carry a CBD premium. A kitchen is a kitchen. What the location adds is time, and time shows up as holding costs rather than as a bigger trade invoice.
| Room | Standard | Mid-range | High-end |
|---|---|---|---|
| Kitchen | $22,000 – $28,000 | $28,000 – $38,000 | $38,000 – $55,000+ |
| Bathroom | $20,000 – $28,000 | $28,000 – $38,000 | $38,000 – $50,000+ |
| Apartment | Full renovation |
|---|---|
| Studio / 1 bed | $60,000 – $100,000 |
| 2 bedroom | $80,000 – $130,000 |
| 3 bedroom | $100,000 – $160,000 |
The full breakdown, including the strata and access costs no general renovation guide spells out, is in our Sydney apartment renovation cost guide. Budget a 15 to 20 percent contingency on top, because CBD stock includes plenty of 1990s and earlier conversions with tired services behind the walls.
In the CBD, the building sets the schedule
This is the real difference, and it is the reason a CBD job needs a builder who has done CBD jobs. Six building rules shape the program before a single trade is booked.
| Building rule | What it does to the job |
|---|---|
| Service lift bookings | Often 2-hour slots. Materials arrive in batches, so deliveries are sequenced weeks ahead. |
| Loading dock access | Booked windows and height limits. A late truck loses its slot to another trade. |
| Same-day waste removal | No on-site storage for spoil. Strip-out is paced by how fast waste can leave. |
| Restricted work hours | Typically 8am to 4pm weekdays. No weekend catch-up, so the calendar stretches. |
| Noise restrictions | Core drilling and jackhammering confined to set windows, which slows demolition. |
| Trade parking | Rarely any. Trades park off site and carry in, which costs time on every arrival. |
None of these are obstacles once they are planned for. They are only expensive when they are discovered in week one, which is what happens when a house builder takes on a tower.
The Market Street apartment, start to finish
A recent Market Street apartment in the CBD is a good example of what the work looks like in practice. The apartment was a dated 1990s interior with oak-panel cabinetry, terracotta-coloured flooring and a beige tile splashback. The brief was a full cosmetic overhaul in neutral, durable finishes to get it ready for sale or high-end rental, rather than a personal renovation for someone staying put.
The kitchen was stripped to the walls and rebuilt as a U-shape in white polyurethane with brushed nickel handles, a pale blue glass splashback and stone benchtops. Both bathrooms were refitted with new vanities, vessel basins, stone-look tiling and frameless glass screens. Light timber-look hybrid flooring replaced the terracotta throughout, and the whole apartment was repainted in neutral tones. Ten weeks on site.


Every kilogram of that arrived through a service lift on a booked window, and every kilogram of the old kitchen left the same way on the same day it came out. That is the part of a CBD renovation nobody photographs, and it is the part that decides whether ten weeks stays ten weeks.
“The team handled our CBD apartment renovation brilliantly. They delivered a stunning transformation. The before and after is incredible. It's like a completely different apartment.”
Strata approval in a large CBD scheme
The rules are the same statewide. What changes in the CBD is scale: bigger schemes, more lots, a professional strata manager rather than a volunteer, and a meeting calendar that does not bend for one apartment.
s109Cosmetic work
$0Painting, carpet, hanging fixtures, built-in wardrobes. No approval needed.
s110Minor renovations
$0 statutoryKitchen, hard flooring, recessed lights, non-structural walls. Ordinary resolution, no by-law.
s108Major works
~$1,200+Anything affecting waterproofing (most bathrooms), structure or plumbing. Special resolution and a registered by-law.
By-law drafting runs around $900 to $1,000 plus GST, plus $182.73 to register it with NSW Land Registry Services. Allow 6 to 12 weeks for major-works approval, and confirm your building's meeting schedule before you set a start date.
Once you renovate the bathroom, the leak is yours
This is the part we carry. In 30 years and more than 1,000 Sydney apartments, our strata approval rate is 100 percent. We prepare the by-law and the application, book the lifts and the dock, work inside the building's hours, and hand over the waterproofing certificate at the end. Fine Touch Group holds NSW Builder Licence 151772C.


Can you take a wall out?
Sometimes, and it needs an engineer's answer before it needs a builder's quote. A non-structural wall can usually come out with strata approval. A load-bearing wall, or one carrying plumbing risers, electrical or ducting, generally cannot. In a high-rise the odds are worse than in a walk-up, because the structure is carrying more.
Four things get established before anything is priced: whether the wall is load-bearing, whether engineering advice is needed, whether strata approval covers it, and what services run through it. We have written the full version of this in removing walls in Sydney apartments.
How long it takes, and living through it
A bathroom is 2 to 3 weeks on site, a kitchen 3 to 4, a full apartment 8 to 16. Market Street ran ten. Strata approval sits ahead of the build, not inside it, so the 6 to 12 weeks it takes runs while you are still selecting finishes.
Whether you can stay comes down to one question: is the kitchen or your only bathroom out of action, and for how long. In the CBD that question is sharper, because restricted hours mean the disruption is spread over more days rather than compressed into fewer. More detail in renovating while living in your apartment.
2026 Sydney Apartment Renovation Price Guide
Real per-room costs, the full strata cost checklist, and the questions to ask before you sign. Sent straight to your inbox.
Renovating a Sydney CBD apartment?
Fixed-price quotes, strata approval handled, and a builder who has worked inside CBD towers for 30 years.
Frequently asked questions
See the project
Sydney CBD apartment transformation, Market Street
Kitchen, two bathrooms, flooring and a full repaint over ten weeks in a high-rise.
Read next
Renovating an apartment to sell in Sydney
What to spend on when the buyer is someone you will never meet, and what is wasted money.
Go deeper
The complete Sydney strata approval guide
By-laws, the works application, and how to get approved without months of back-and-forth.